Sunday, June 13, 2010

Inserting Exercise Table Into Blog




DECLARATION OF COMPLIANCE IN LIEU OF THE DECLARATION OF CONFORMITY 'FOR PLANTS WITHOUT installed before March 27, 2008
With regard to plant safety, the new Ministerial Decree 37/2008, Article 7, paragraph 6, provides that if "the declaration of compliance 'in the preceding paragraphs is no longer available or was never generated by the companies installed (without prejudice to the latter, the liability under Article 15 of the present Dm ), that document is replaced by a 'statement of compliance, "provided that such equipment installed prior to March 27, 2008 (date of entry into force of the same Dm). The "declaration of compliance 'is different from the" declaration of conformity "mainly on the parties involved to release it. May in fact be made, subject to appointment by the property owner and as a result of inspections and technical assessments: either by a qualified professional and the professional writing, according to the specific technical skills required in relation to single plant, or, for facilities other than those listed in Article 5, paragraph 2, the DM in question, by a person who is responsible for at least five years of an engineer certified to operate in the technical field covered by the system (regardless from any consideration of the company installed). As regards the specific content that the "declaration of compliance 'must have, the Dm 37/2008, unlike what we did for the" declaration of conformity "with Annexes I and II does not provide a clear model to follow. It is likely, therefore, believe that the bodies responsible for issuing the "statement of compliance 'may take as a reference to Annex II, provided for cases in which the' declaration of conformity" rather than being made directly from plumbers, to be released then the heads of the technical offices of companies that are not installed in Article 3, paragraph 3 of the decree.

Annex II Dm 37/2008
DECLARATION OF CONFORMITY 'PLANT TO RULE THE ART

Terms of reference for the use of technical offices of enterprises not installed

the undersigned ............... ... ... ........................ .................................................. ........................ ... ... ... ... ......
qualification ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ..
head of internal technical undertaking not to install (name) ... ... ... ... ... ... ... ........................
..................................... ... ... ... .......... .................................................. ..............................
active in ............................................. ................ with headquarters at ...................................... ....
........................ No ................ Common ............................... (Prov. ............................) tel. ............ ... ... ....
fax .......................................... E-mail box ... ... ... ... ... ... ... ... ... ... ... .................................... ...............
executing system (outline) ................................. ... ... ..... .................... ... ... ... ........
................................................ .................................................. .......................................... ... ... ... ..... ......
understood as: 􀀀 new processing plant 􀀀 􀀀 expansion 􀀀 maintenance
extraordinary
􀀀 more ... ............................ ......................................... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... .... ... ... ....
installed in the premises in the town of ......................................... ........................... (Prov. ......................)
via ..................... ................................................. No ................ scale .......... Plan .......... Internal ............
owned by (name, last name or business name and address) ...................... ... ... ........... ........................
................................................ .................................................. .................................................. ..............
in building used by the plumbers not to use: industrial
􀀀 􀀀 civil 􀀀 􀀀 other commercial uses;
HEREBY
under his own responsibility, that the plant was carried out in conformity with the rule
art, according to art. 6, taking into account operating conditions and
intended uses of the building, having in particular:
􀀀 observed the bill drafted pursuant to art. 5 from (1) ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ..;
􀀀 below the norm technique applicable to the use (2) .......................................... ...................................
................................................ .................................................. .................................................. ..............
􀀀 installed components and materials suitable for the installation site (Articles 5 and 6);
􀀀 monitored the plant for safety and correct operation successful, having carried out
checks required by the rules and provisions law.
Attachments required:
􀀀 project within the meaning of Articles 5 and 7 (3);
􀀀 relationship with types of materials used (4);
􀀀 plant layout made (5);
􀀀 reference to previous statements of compliance or partial existing (6);
Optional Attachments (7):
. .................................................. ....................
................................................ .......................
DISCLAIMS any liability for accidents to persons or property resulting from tampering with the system by
third parties or to lack of maintenance or repair.

0 comments:

Post a Comment